Multi-vendor Eco Data Centre & Hosting

Multi-vendor Eco Data Centre & Hosting

Have you started planning how to reduce your carbon footprint in line with new Government legislation?

Blue Chip is in the final process of building Europe’s most Energy Efficient Data Centre.

This will be our 3rd and largest Data Centre in the UK - built with resilience and energy efficiency at the forefront of its design and it will come online in March 2010.

Here are some of the high points.

21st Century Green Approach to Data Centre Provision Multi-vendor Eco Data Centre & Hosting

  • Addressing your carbon reduction commitment
  • Efficient Data Centre Adiabatic Cooling with CRAC as backup
  • Target Power Usage Effectiveness (PUE) of 1.1

Unparalleled Data Centre Resilience

  • Independent A and B power feeds
  • Diverse Fibre communications via multiple Tier 1 suppliers
  • 2 x (N+1) Generator and UPS for both A and B supplies
  • 2 x (N+1) Cooling via Adiabatic (N+1) and CRAC (N+1)
  • 2 x 11KV HV grid power supplies to the site
  • No Single Point of Failure
Multi-vendor Eco Data Centre & Hosting - Video

Infrastructure and physical security built in

  • CCTV with 24 hour video surveillance, 24 hour manned
  • Secure Access through automatic double gates and turnstiles
  • Biometric access control to data suites
  • Zoned fire detection and protection

Space for today with room to grow

  • Blue Chip freehold 5 acre site outside the M25, north of London
  • Located in Bedford - 35 minutes by fast train from St. Pancras
  • Phase 1 consisting of 24,000 sq ft (approximately 360 racks)
  • Room within the same building for another 200 racks in Phase 2
  • Workplace recovery suite for up to 120 people

Come and see for yourself

We would like to invite you to attend a presentation of our new Energy Efficient Data Centre.

March 9th or March 17th 2010 in Bedford.

Agenda

  • 10:00hrs
    • Arrival and coffee.
    • Managing Director Welcome.
    • Data Centre design and construction.
    • Power efficiency and resilience.
    • Tour of the data centre.
  • 13:00hrs
    • Lunch and close 1300hrs approx.

In order to reserve your place or just to find out more please enquire via our enquiry form or telephone 01234 224400.